Eclipse Leisure Centre, Staines

Project details

  • Location: Spelthorne, Staines

  • Completed: November 2024

  • Client: Spelthorne Borough Council

  • Main contractor: Willmott Dixon

  • Facility highlight: UK’s largest wet and dry leisure centre to achieve Passivhaus

  • Area delivered: 6-court sports hall

  • System installed: Reflex GameChanger interactive LED sports flooring system within Reflex PU

Reflex GameChanger interactive LED sports flooring system within Reflex PU in the UK’s largest wet and dry leisure centre to achieve Passivhaus

Project Overview

Brief

Eclipse Leisure Centre was delivered to meet stringent Passivhaus criteria, setting a high standard for energy efficient public leisure facilities.

Challenge

The sports hall needed a floor that could support a wide range of activities within a flagship, high-performance building, while maintaining a clean finish suitable for a modern multi-use venue.

Solution

Reflex supplied and installed the GameChanger flooring system in the 6-court sports hall, combining LED lit court lines with Reflex PU flooring to support flexible programming.

Delivery

Working alongside the wider project team, Reflex delivered the sports hall flooring solution as part of the centre’s wider wet and dry leisure development.

Outcome

The sports hall can now “light up” courts as required, supporting multi-sport use and flexible scheduling within a facility designed for long-term performance and community benefit.

Finish

LED lit lines are integrated within the Reflex PU flooring system, creating illuminated courts without relying on permanent painted markings.

What we delivered

A GameChanger LED sports flooring installation for the Eclipse Leisure Centre sports hall, supporting flexible court layouts and multi-sport programming within a flagship Passivhaus leisure facility.

Flooring specification

  • Facility area: 6-court sports hall

  • System: Reflex GameChanger LED flooring system

  • Construction: LED lit lines integrated within Reflex PU flooring

  • Key benefit: Courts can be illuminated as required to suit different activities

  • Project team: Spelthorne Borough Council, Willmott Dixon, GT3 Architects

Planning a leisure centre sports hall upgrade or new build? We can help you specify a flooring system that supports multi-use programming, performance, and long-term value. Speak to the team to discuss your project.

Chat to us about your project

A1
A2
A3
A4
A5